Multi-tasking & me

**Warning this contains some brain dumpage and rambling**

I was reading Stepwise Girl’s post today and she pointed out that she had a lot of things to do and was having problems switching between them. That got me to thinking about how I have the same problem. I like to complete a project before moving on to the next one. About half way through the first project I get anxious to start the next, but I force myself to focus and complete my current one. Then, the new project serves as a sort of “reward.” When I was younger this worked out fairly well for me. I could study one complete section from one subject thoroughly and then move on to the next subject. Or I could serve on whatever committee/volunteer at whatever organization until that particular time period/event was over and it’d be done. However, this is not working so well for me in the lab right now.

I’ve got two major projects (Yeast and FPE-Related)–that are related to each other but involve two different organisms and techniques– and each has a variety of sub-projects (vector constructions, protein purification, etc.). Plus, I’m supposed to be helping Advisor write a review about Enzyme Subunit. I’m also mentoring an undergraduate student this summer and will likely be adding another in the fall. All told this doesn’t feel like it’s too much, but recently I realized that I put most of the the other Major Project on hold while I’ve been working on Yeast Project for Major European Conference. I’ve gotten to the point in FPE-Related Project that I’d have to commit about three full, consecutive days to it in order to move it to the next level. I haven’t done that yet, because I have to keep Yeast Project going (Advisor’s orders). In the meantime, I’m taking breaks from working on Yeast Project to mentor Untrained and Flighty Undergrad (who from here on out will be referred to as Flighty, I think. It sounds harsh, though, so I’m still debating this name). This takes approximately three times longer than I think it will and have begun to schedule it accordingly.

Yes, I’ve started to actually schedule my day. I’m talking fifteen or so minute increments. Otherwise I’ll sit down and think Crap. What was it I was supposed to be doing next? At the end of each day I look at what I did that day, figure out what the next steps are, and schedule those for the following day (I’ve found the following multipliers to be useful: 1.5 for experiments, 3.0 for training, and +/- 0.5 for Reading, Writing, etc.). I’ve even started to broadly schedule my time at home (first get home dishes and laundry; some time in the evening clean bathtub, sink, & toilet– yes, I lead a very exciting life). I’m not sure that this will work or is entirely necessary, but I really want to stuff done FPE-Related Project and desperate times call for desperate measures.

This entry was posted in Uncategorized. Bookmark the permalink.

4 Responses to Multi-tasking & me

  1. Brigindo says:

    Scheduling my day never worked very well for me but you are definitely right about the need to find a system that works for you. I’ve found the deeper you get into academia the more these competing priorities arise.

  2. I can’t do this every day without suffering some sort of brain hemorrhage, but at least once a week I try to set up a day where I have multiple preps going that require careful time stacking to get it all to work. Those have to be well-mapped out the day before, with reagents and solutions either ready or time to make them planned in there. If I can make it so I don’t have to do a lot of thinking, I can do way too many different things at one time. Just not 7 days a week, like Boss wants.

  3. Amanda says:

    Brigindo: I’ve never really tried this before, but I’m getting desperate. I think the only thing that’ll work is trial and error.

    TT: I think you’re right. Brain hemorrhage is eminent.

  4. What’s been working for me over the past few days is to plan, but not too rigidly, and set attainable objectives for that day. I make a short mental list of what I want to work on that day, but most specifically I pick a specific task that I will start the day with (start with putting together datatable for SideProject. That helps me get on track. What helps also is to know exactly which smaller tasks I need to do (call X, email Y, fill form Z) so I don’t end up waisting time figuring what they were. Let us know how this works for you!